This Master Plan Sheet includes
projects for the Long Term Facility Improvement Program
(LTFIP). These projects were enabled by Passage of
Measure C and by funding from the State via SB50,
Prop 47 and Prop. 55. Additional resources are provided
from local Developer Fees and Deferred Maintenance
Grants from the State.
This Plan generally does not include projects intended to occur after completion
of the Bond Program. Some projects may occur after completion of the bond program
based on availability of peripheral funding resources.
This Plan does not include regular maintenance projects.
Project Scope indicated on this Plan is general and represents only the most
prominent project features.
|
|
All
project components reflect the original goals
of the LTFIP and prior Facilities Inventories
prepared by the District. Preliminary Design
has been completed on most LTFIP Projects to
the extent that general components, budgets and
goals have been identified and synthesized into
a working Conceptual Design.
Many future project features are based on District Standards developed prior
to passage of Measure C and in response to the input and participation of the
Planning Review Committees during the first half of the LTFIP.
Most Project requirements of future projects represent repetition of previous
projects in similar spaces. Most Modernization methods, products and systems
have already been established in previous projects.
|
|